Soi 94 resurfacing work

Driving and riding in Hua Hin and Thailand, all topics on cars, pickups, bikes, boats, licenses, roads, and motoring in general.
Post Reply
User avatar
huahin4ever
Ace
Ace
Posts: 1147
Joined: Tue Jul 17, 2012 12:07 pm
Location: Hua Hin

Re: Soi 94 resurfacing work

Post by huahin4ever »

This is how they should have gone about it in the first place. The stops and the problems with underground issues and the previous contractor have caused the issues. If they continue every day working as now I for myself, couldn't care less that it has to become worse before better. They need to put in the proper drainage which they hadn't completed from Atmosphere and up to Initial Hotel, and the old surface must be removed, leveled and made ready for concrete I believe. At last, they are at least doing a proper job with proper machinery, and not those toy equipments the first contractor had.
YNWA
Meerkat
Amateur
Amateur
Posts: 47
Joined: Wed Aug 26, 2015 1:12 pm

Re: Soi 94 resurfacing work

Post by Meerkat »

joelle wrote: Tue Jul 15, 2025 6:17 pm
Big Boy wrote: Tue Jul 15, 2025 5:51 pm I'm still housebound guys. I presume the work on Soi 94 has finished. How's it looking please?
Drove through yesterday evening, was quite bad.

Read on Hua Hin Today :

🚧 𝗦𝗼𝗶 𝟵𝟰 𝗿𝗼𝗮𝗱𝘄𝗼𝗿𝗸𝘀 𝘀𝗲𝘁 𝗳𝗼𝗿 𝗰𝗼𝗺𝗽𝗹𝗲𝘁𝗶𝗼𝗻 𝗯𝘆 𝗲𝗻𝗱 𝗼𝗳 𝗢𝗰𝘁𝗼𝗯𝗲𝗿

Road construction work on Soi 94 in central Hua Hin is now expected to be completed by the end of October, according to local officials said on Monday.

The resurfacing project, which covers a 500-metre stretch of the road, includes the installation of reinforced concrete and upgraded drainage systems. The project began on 22 July 2024 and was originally scheduled to be completed in February this year.

However, work was halted due to issues involving underground utilities and soil subsidence. These complications required a revision of the original construction plans, resulting in a significant delay.

On 14 July 2025, Mr. Jirawat Phrammanee, Municipal Clerk and Chairman of the Contract Inspection Committee, visited the site to inspect progress on behalf of the Mayor of Hua Hin City Municipality. He was joined by Ms. Nonglak Phadungthot, a member of the municipal council, along with Mr. Kalayut Kuyukham, Director of the Engineering Office, site engineers and the contractor.

During the inspection, officials confirmed that the first section of the road is currently undergoing surface adjustments, while drainage manholes are being installed in the second section.

Hua Hin City Municipality has acknowledged the inconvenience caused by the extended timeline and offered apologies to local residents and businesses affected by the construction.

Once completed, the upgraded road and improved drainage are expected to reduce flooding and improve traffic flow in the area.
Hmm. 'End of October'. I note it doesn't say in which year . . .
User avatar
Big Boy
Moderator
Moderator
Posts: 49311
Joined: Fri Nov 04, 2005 7:36 pm
Location: Bon Kai

Re: Soi 94 resurfacing work

Post by Big Boy »

Wow!!! Just seen this. Real progress at last.

Championship Plymouth Argyle 1 - 2 Leeds Utd :cry: :cry: :cry: :cry:

Points 46; Position 23 RELEGATED :cry: :cry:
User avatar
Big Boy
Moderator
Moderator
Posts: 49311
Joined: Fri Nov 04, 2005 7:36 pm
Location: Bon Kai

Re: Soi 94 resurfacing work

Post by Big Boy »

Closed.png
Closed.png (173.85 KiB) Viewed 555 times
Championship Plymouth Argyle 1 - 2 Leeds Utd :cry: :cry: :cry: :cry:

Points 46; Position 23 RELEGATED :cry: :cry:
Meerkat
Amateur
Amateur
Posts: 47
Joined: Wed Aug 26, 2015 1:12 pm

Re: Soi 94 resurfacing work

Post by Meerkat »

Stop Press! Concrete laid on Soi 94. From the 7/11 west to about half way to the cross roads by the 'Irish' pub. LH side only, but, wow, what a sight!
User avatar
huahin4ever
Ace
Ace
Posts: 1147
Joined: Tue Jul 17, 2012 12:07 pm
Location: Hua Hin

Re: Soi 94 resurfacing work

Post by huahin4ever »

Meerkat wrote:Stop Press! Concrete laid on Soi 94. From the 7/11 west to about half way to the cross roads by the 'Irish' pub. LH side only, but, wow, what a sight!
Yes they did it yesterday afternoon/evening.

YNWA

YNWA
User avatar
usual suspect
Ace
Ace
Posts: 1940
Joined: Mon Jun 27, 2005 10:10 pm
Location: Huahin

Re: Soi 94 resurfacing work

Post by usual suspect »

Hope the layer of concrete (or the base of soft sand underneath) can handle the weight of the fuel tanker-trucks that visit the small petrol station towards the top end..??
User avatar
Dannie Boy
Hero
Hero
Posts: 13890
Joined: Wed Jan 13, 2010 8:12 pm
Location: Closer to Cha Am than Hua Hin

Re: Soi 94 resurfacing work

Post by Dannie Boy »

Nearly all roads in Thailand suffer from poor preparation, so even when they’ve finished laying a new stretch of road (particularly when it’s tarmac). It initially looks great but after a few months of big heavy soil trucks (and petrol tankers), they soon begin to show that the preparations weren’t up to standard and within a few years will need doing again - keeps people in jobs I suppose?
User avatar
Big Boy
Moderator
Moderator
Posts: 49311
Joined: Fri Nov 04, 2005 7:36 pm
Location: Bon Kai

Re: Soi 94 resurfacing work

Post by Big Boy »

Oh what joy, my son went to a couple of Soi 94 bars last night.

Mud.jpg
Mud.jpg (45.13 KiB) Viewed 95 times
Championship Plymouth Argyle 1 - 2 Leeds Utd :cry: :cry: :cry: :cry:

Points 46; Position 23 RELEGATED :cry: :cry:
User avatar
huahin4ever
Ace
Ace
Posts: 1147
Joined: Tue Jul 17, 2012 12:07 pm
Location: Hua Hin

Re: Soi 94 resurfacing work

Post by huahin4ever »

Big Boy wrote:Oh what joy, my son went to a couple of Soi 94 bars last night.

Mud.jpg
Patience, patience! It will be good. This contractor is hauling ass! As always it will be worse before getting better, especially now with rain every day. I'm wondering, did your son really think it would be dry, clean and hard surface now when they are working?

Sent from my SM-X926B using Tapatalk

YNWA
User avatar
Big Boy
Moderator
Moderator
Posts: 49311
Joined: Fri Nov 04, 2005 7:36 pm
Location: Bon Kai

Re: Soi 94 resurfacing work

Post by Big Boy »

The mud on shoes is not a major consideration. He will simply avoid until finished.

The consideration is the effect on businesses on Soi 94 until its finished in OCTOBER - maybe 3 months away during rainy season. Will people visit these bars knowing they have to walk through a street resembling something like a Wild West town, when there are clean places to visit?

The entire project has been a mess (pun intended).
Championship Plymouth Argyle 1 - 2 Leeds Utd :cry: :cry: :cry: :cry:

Points 46; Position 23 RELEGATED :cry: :cry:
fft100
Professional
Professional
Posts: 494
Joined: Wed Oct 26, 2005 11:58 pm

Re: Soi 94 resurfacing work

Post by fft100 »

This morning 11am...a lot of mud !
6212025113249.jpg
6212025113344.jpg
But motorbikes still struggling through :-)
6212025113249.jpg
Attachments
6212025113740.jpg
User avatar
Big Boy
Moderator
Moderator
Posts: 49311
Joined: Fri Nov 04, 2005 7:36 pm
Location: Bon Kai

Re: Soi 94 resurfacing work

Post by Big Boy »

Wow!, I'm still housebound, so haven't seen it, but I must say, that is worse than I expected. Thanks for sharing those photos.